How We Restored This Waupaca Shoreline in 3 Weeks [Case Study]

January 8, 2026

Shoreline Restoration in Waupaca, WI: Erosion Control Case Study by TLC Lawns & Landscaping

A kayak sits on the shore of a lake. Trees and a picnic table are in the background.

Shoreline erosion is a serious problem for many homeowners across Waupaca’s Chain O’ Lakes and riverfront areas. Left unchecked, erosion can eat away at your property, damage nearby structures, and ruin lake access.

In this post, we walk you through a real-life shoreline restoration project completed by TLC Lawns & Landscaping—from initial assessment to final results—in just 3 weeks. You’ll see how we stabilized the shoreline, enhanced the landscape, and protected a homeowner’s investment using a proven process tailored to Wisconsin’s natural environment.

Project Background

Location: Long Lake, Waupaca, WI
Timeline: 3 weeks from demo to completion
Client Goals:

  • Stop further shoreline erosion

  • Improve safety and access to the water

  • Maintain a natural, lakefront aesthetic

  • Comply with environmental regulations

The Problem:

The homeowner had been battling increasing erosion over the past 5 years. Each spring, they noticed soil loss along the bank, and several trees near the waterline had started to lean due to shifting ground. The original shoreline edge was undefined and offered no protection from wave action or runoff.

They reached out to TLC Lawns & Landscaping in early spring 2025 for help.

Step 1: Site Assessment & Planning

We began with a full site inspection, evaluating:

  • Soil composition and slope

  • Wave and water activity

  • Tree root exposure

  • Drainage and runoff patterns

  • DNR compliance needs

Our team took elevation readings, photos, and measurements. We then worked with the homeowner to create a custom shoreline restoration plan using a combination of riprap, native vegetation, and reshaping of the bank for long-term durability.

Permitting:

Because the property bordered a navigable waterway, we assisted the client with a Wisconsin DNR permit application, ensuring the project would meet all regulatory guidelines before construction began.

Step 2: Shoreline Preparation

The first phase of work involved clearing and prepping the site:

  • Removed unstable soil and debris

  • Trimmed or removed low-risk trees near the shoreline

  • Excavated and reshaped the slope to reduce runoff speed

  • Installed proper drainage grading above the shoreline

We also brought in stone and erosion control materials and created a staging area for equipment and material movement—important for tight lakefront properties.

Step 3: Riprap Installation

To stabilize the shoreline, we installed 12 linear feet of riprap:

  • Geotextile fabric was laid down first to prevent soil movement beneath the rocks

  • A 12–18 inch layer of fieldstone and fractured granite was placed for maximum wave absorption

  • Stone was carefully stacked and compacted along the slope, blending naturally with the surroundings

This created an armored shoreline barrier strong enough to handle ice heave, wave action, and rain runoff for years to come.

Step 4: Native Vegetation Planting

We planted a 3-foot buffer zone of native grasses and low-growing perennials along the top of the riprap, including:

  • Little bluestem

  • Switchgrass

  • Black-eyed Susan

  • Blue flag iris (for moist conditions)

These deep-rooted plants help reinforce the shoreline from above, capturing runoff and preventing future erosion. They also improve wildlife habitat and enhance the lakefront’s natural beauty.

Step 5: Final Grading, Mulching & Cleanup

To finish the project:

  • We graded and seeded the upland lawn area for a smooth transition

  • Installed mulch rings around remaining trees

  • Applied erosion control blankets in key spots

  • Cleaned and restored the work zone

  • Walked the property with the client to review everything and provide care instructions

Results: Before & After

Before:

  • Exposed soil and roots

  • Uneven shoreline slope

  • No natural barrier to wave action

  • Limited planting and visual appeal

After:

  • Stable riprap shoreline protecting the full waterline

  • Native plant buffer improving aesthetics and erosion control

  • Defined water access for kayaking and swimming

  • Compliant with DNR shoreline rules

What Made This Project Successful?

1. A Customized Plan

We didn’t use a one-size-fits-all template. We matched the shoreline conditions with the right mix of structural and ecological solutions.

2. Fast Turnaround

Thanks to pre-planning and efficient staging, the entire project—from excavation to final planting—was completed in just 3 weeks.

3. Local Expertise

We’ve been working on shorelines in Waupaca since 1999. Our team understands the lakes, the soil, and the permitting process.

4. A Lasting Investment

This shoreline will protect the homeowner’s land and enhance the view for decades with minimal maintenance.

Could Your Shoreline Use Help?

If your Waupaca-area lakefront is showing signs of erosion, leaning trees, or muddy runoff—now’s the time to act. Whether you’re dealing with a new problem or a long-standing issue, TLC Lawns & Landscaping provides shoreline solutions that are:

  • Environmentally sound

  • Long-lasting

  • Visually appealing

  • Fully code-compliant

Frequently Asked Questions

How do I know if my shoreline needs restoration?

Signs include eroded soil, exposed roots, sinking ground, or cloudy water runoff. If you’re unsure, we offer free shoreline evaluations.

How long does a typical shoreline project take?

Most residential shoreline restorations take 2–4 weeks depending on size, materials, and permitting.

Is shoreline work allowed in Wisconsin?

Yes, but most projects near water require DNR permits. TLC helps clients navigate the entire permitting process.

Will riprap ruin my lake view?

No—when installed correctly, riprap can blend beautifully with native plantings and actually improve the shoreline’s appearance.

What’s the average cost of a shoreline restoration?

Pricing varies by shoreline length and slope. Most TLC projects range from $4,000 to $15,000. We provide detailed quotes after a site visit.

Let’s Restore Your Shoreline — the Right Way

If you want your shoreline to be stronger, safer, and more beautiful, TLC Lawns & Landscaping is ready to help. We’ve restored dozens of Waupaca waterfronts with solutions that work and last.

Call (715) 258-0300 or
Email tom.leonard@email.com to schedule your free shoreline consultation today.

Check out more local project photos here:
https://www.facebook.com/TlcLawnLandscaping

Snowplow clearing a snowy road; trees and guardrail on either side, white winter setting.
December 23, 2025
Prepare for winter 2025 with professional snow removal in Waupaca, WI. Learn how TLC Lawns & Landscaping keeps your property safe and clear.
Person in bright green workwear power washing stone steps.
December 8, 2025
Need power washing near Waupaca, WI? Learn what to expect, why it matters, and how TLC can restore your home’s exterior safely and efficiently.
Wooden pathway with steps winding through a lush garden with dark pebbles and greenery.
November 21, 2025
Comparing stone and wood steps for sloped yards in Waupaca, WI? Discover which option fits your hillside best with tips from TLC Lawns & Landscaping.
Show More